Activities

The project work has been divided into six workpackages (WP). WP1 includes the Coordination & Dissemination activities. Research & technology development activities are covered by WP2, WP3, WP4, within three Design Campaigns, and run sequentially  during the three years of the project. In parallel, Collaborative techniques activities are covered in WP5 as well as Knowledge enable information technologies activities in WP6 all along the project duration.

WP Leader: DLR

WP Tasks:

  • 1.1 Administrative management (DLR)
  • 1.2 Technical management (DLR)
  • 1.3 Dissemination and Exploitation (CFSE)

WP LeaderBombardier

WP Tasks:

  • 2.1 Synchronization common data model and tool wrapping (DLR)
  • 2.2 Set up state-of-the-art distributed-integrated MDO systems (ONERA)
  • 2.3 State-of-the-art optimization of reference aircraft (Bombardier)
  • 2.4 Specification and requirements future MDO system (Airbus DS)

WP LeaderONERA

WP Tasks:

  • 3.1 Formulation and approximation approaches (ONERA)
  • 3.2 Robust Design Optimization & Uncertainties Analysis (NOESIS)
  • 3.3 Mixed Fidelity Optimization including High Fidelity (DLR)
  • 3.4 Multiscale and dual framework optimization (FOKKER)
  • 3.5 System of Systems Optimization (CIAM)

WP LeaderTU Delft

WP Tasks:

  • 4.1 HARLS, strut-braced aircraft configuration (Bombardier)
  • 4.2 Box Wing aircraft configuration (ONERA)
  • 4.3 Blended Wing Body aircraft configuration (DLR)
  • 4.4 Novel Propulsion-Airframe Configuration (CFSE)
  • 4.5 UAV configuration (Airbus DS)
  • 4.6 Advanced Turboprop Configuration (Alenia)

WP LeaderDLR

WP Tasks:

  • 5.1 Collaboration process and decision making (DLR)
  • 5.2 Collaborative pre-/post processing, visualization (RWTH)
  • 5.3 Adaptation of design environment for collaborative optimization (NOESIS)

WP LeaderKE-Works

WP Tasks:

  • 6.1 Common data support for design data (DLR)
  • 6.2 Disciplinary data fusion (Airinnova)
  • 6.3 Knowledge based workflow manager (KE-Works)
  • 6.4 Knowledge modeling and knowledge bases generation (TU Delft)
  • 6.5 KBE to support MDO (Genworks BV)